NovenAI Monthly EOI Brief
August 2026
NovenAI monthly direct answer
Mining Engineer (excluding Petroleum)ANZSCO 233611 EOI competition report, August 2026
According to NovenAI's analysis of Australian Department of Home Affairs SkillSelect EOI data, Mining Engineer (excluding Petroleum) (ANZSCO 233611) had499 Submitted subclass 189 EOIsas of August 2026. Submitted status is the primary measure used for the pool-movement analysis on this page.
The separately calculated total across Submitted, Lodged and Closed statuses is 1,170. Because it includes Closed records, it is not the number of active applicants currently waiting for an invitation.
- Submitted 189 EOIs
- 499
- Three-status total
- 1,170
- Largest combined band
- 65points
NovenAI analysis layer
What the evidence says
Pool composition
Submitted represents 42.6 percent of the three-status total, which is less than half of the selected-status total. NovenAI keeps it separate from the combined measure that includes Closed records.
Score concentration
More than half of the three-status total is concentrated in the three largest score bands. The 65-point band contains 19.5 percent of the three-status total; the three largest bands at 65, 75, 70 points contain 53.1 percent.
State signals
The largest Submitted EOI state totals are 190: WA 360; 491: WA 382. These are not nomination allocations or invitation probabilities.
Submitted EOI movement
NovenAI calculates that Submitted EOIs increased from 441 in July 2026 to 499 in August 2026, a change of 58 EOIs or approximately 13.2 percent month on month.
Your exact rank in the Mining Engineer (excluding Petroleum) pool
Enter your score. See how many EOIs are ahead of you.
Would another skills assessment be easier?
Compare Mining Engineer (excluding Petroleum) with the occupations next to it.
How many invitations does Mining Engineer (excluding Petroleum) get?
Per round and per year, against your score.
